You are currently viewing August 26, 2021 – K. Graney Business Update

PODCAST

Hi everyone; it’s Kevin.  Today is Thursday, August 26th.

This time last week, we were concerned about the path of Tropical Storm Henri.  As a region we were spared from any widespread damage. The EB team, including our facilities folks, did a tremendous and masterful job in making sure we were well prepared, and I am thankful for everyone’s hard work. As we approach the end of summer, I’d like to give you an update on the progress we’ve made over the last two months.

  • Starting with Columbia, the motor module deck join has been initiated. This is significant because this deck will hold Columbia’s integrated power system including the electronics and the propulsion motor itself.
  • Our supplier Babcock Marine, in the UK, shipped another Columbia missile tube, bringing to 10 the number of lead ship tubes shipped to Quonset Point. Six more tubes are needed to complete the shipset and those tubes are planned to be here between now and the end of the year. Earlier this summer at QP, the centerline decks were installed into the fixture for Columbia’s Missile Quad Pack #2 in preparation for the remaining two tube loads.

On the Virginia Program, it’s been very busy, especially here in Groton, and we’ve made good progress across several boats:

  • On SSN 790, USS South Dakota, certification is nearly complete for fast cruise and sea trials following her extensive PSA.
  • Earlier this month, SSN 791, the USS Delaware, completed 96-hour testing in preparation for her post-PSA sea trials. Last week she relocated to the SUBASE for final crew certification and fast cruise preparations.  Certification for fast cruise is expected within the next week.
  • SSN 793, PCU Oregon, is completing final preparations supporting September sea trials.
  • On July 31st we celebrated the christening for SSN 795, PCU Rickover, and then moved the boat to the pontoon for float up, which is taking place today.
  • On SSN 797, PCU Iowa, we completed weapons-module end-load and the Command and Control Systems Module load into section 1-2A in support of achieving pressure hull complete in October. We should expect to see the rest of the hull move from Bay 3 to Bay 5 in the coming week.
  • Earlier this summer SSN 799, PCU Idaho, achieved initial fill with a nearly four-month reduction in schedule—a tremendous effort by everyone involved. More recently, all flushes associated with the 799’s initial fill were completed with zero cleanliness issues and a 12-day reduction in the schedule, which reflects our focus on improving the reactor plant build process. SSN 801, PCU Utah, and SSN 803, PCU Arizona, reactor plant paths are also a waterfront focus and are tracking for additional hull-over-hull improvements. So great work to the team there and looking forward to seeing some significant improvements on the upcoming hulls.
  • Also on the Utah, the Groton team completed the pairing of Section 6/7 with the reactor plant module. On next Wednesday, September 1, we will celebrate the keel laying for Utah at Quonset Point.
  • On SSN 802, PCU Oklahoma, the Modular Integrated Deck Structure, or MIDs, has been loaded into Section 6/7 in Building 9 at Quonset Point, and we will deliver that module to Newport News before the end of the year.
  • We are making progress on the USS Hartford EOH; this is the Smart-Start portion of the engineered overhaul.  There are about 600 people working on that job, and the team recently completed the hull cut on 6A. Hartford will enter dry dock in October.
  • Within the last month, the South Yard Assembly Building team installed the first roof truss—a key milestone in the steel erection process. The topping-off ceremony for the building, when the last steel roof beam is placed, will take place early next year. That building is moving along very quickly.

We still see daily reports of COVID cases at EB.  A reminder—all employees should be wearing masks indoors where they are unable to maintain social distancing.  And, if you haven’t gotten a vaccine yet, please do so.  Vaccines are available at all EB pharmacies and dispensaries.

On Friday, we will host newly appointed Secretary of the Navy Carlos Del Toro for a tour of the Groton shipyard. Secretary Del Toro recently received Senate confirmation and one of his first official actions is to tour EB which demonstrates just how important our work is to the nation’s defense.

Thanks for all your hard work; we’ll talk again soon.

803 Section 2B/5 Transported from Quonset Point to Groton

PCU Arizona’s (SSGN 803) Section 2B/5 was successfully delivered to Groton from Quonset Point. At 184 feet in length, this section – which includes the Virginia Payload Module (VPM) – is the largest Virginia-class shipment ever transported. Arizona, the first submarine to incorporate VPM, will be about 460 feet long upon final construction. Section 2B/5...Continue reading→

Remembering September 11

On September 11, 2001, the Twin Towers of downtown Manhattan’s World Trade Center and the Pentagon in Washington, D.C., were targeted in a series of coordinated attacks that would leave an everlasting imprint on our country’s psyche. As the events unfolded on that Tuesday morning, nearly 3,000 people lost their lives, over 600 were injured...Continue reading→

Atlas Plaque Unveiled, Honoring Plank Owners at South Yard Ceremony

Employees who have worked on Atlas, EB’s new state-of-the-art floating dry dock, gathered in the South Yard on Wednesday, Aug. 26, to unveil a new bronze plaque recognizing the contributions of its plank owners. The event celebrated the teams who helped bring Atlas from Bollinger Shipyards in Louisiana to its arrival in Groton earlier this year. Atlas will play...Continue reading→

Rayha Report Ep. 26: Waterford Campus Groundbreaking

EB President Mark Rayha reports from the groundbreaking of the new Waterford Campus, where innovation, engineering and workforce development will come together to support our mission. The new facility will help train hundreds of shipbuilders daily as EB continues to grow for future production demands.

Waterford Campus Groundbreaking Marks EB’s Next Step in Innovation and Workforce Growth

Electric Boat officially broke ground Friday on the Waterford Campus, launching the transformation of the former Crystal Mall into a center for innovation, engineering and high‑tech workforce development. EB President Mark Rayha underscored how the project will reshape the way the company designs, tests and builds submarines. Innovation is the key, he said. “There’s an opportunity to...Continue reading→

Powering HeartStrong 50: Thank You, EB Teams—Let’s Keep the Momentum Going!

​Thank you to our incredible EB Heart Walk teams, our community partners, and everyone who joined the American Heart Association (AHA) Torch Journey photoshoot. Your enthusiasm and dedication made this milestone truly special. Now let’s keep our HeartStrong 50 energy going—our goal is 50 teams and $50,000 raised for the 2026 AHA Eastern Connecticut Heart Walk on October 3 at UConn Avery...Continue reading→

Speed Cameras to be Installed in the City of Groton

The City of Groton Police Department announced that automated speed enforcement cameras will be installed at several locations throughout the city. The cameras will be installed after the required 30-day public notification period, which began on Aug. 7, 2026. Camera locations: Mitchell Street Thames Street Clarence B. Sharp Highway (Route 349) Police said the purpose...Continue reading→