You are currently viewing January 16, 2020 – Commemorating the 38-Year Anniversary of the USS Grayback Accident

​On January 16, 1982, near midnight, the “mini-sub,” a Navy Seal delivery vehicle (SDV) involved in a classified mission off the coast of the Philippines, returned to its host submarine USS Grayback (LPSS-574). After stowing the SDV, USS Grayback’s support divers and the SDV crew (six team members total) remained within the flooded wet side starboard hangar preparing to shut the outer hangar door and drain and vent the hangar prior to re-entering the submarine.

Soon the wet-side divers felt dizzy and short of breath. One operator checked vent valve position but couldn’t open the valve any farther. Later, someone keyed the wet-side communication microphone but didn’t speak. Five of the six divers passed out and fell into the water. One diver managed to hook his arm over a pipe to avoid falling before he also passed out. The dry-side operators attempted microphone and tap signal communications. After several more minutes of communications attempts, the diver whom had hooked his arm on a pipe began to revive and reported that he needed help. Dry-side operators then entered the hangar and found that five of the six divers had died.

Charles Wayne Bloomer, Rodney Lee Fitz, William C. Robinson, Leslie C. Shelton, and Richard D. Bond lost their lives that night.

A formal investigation revealed several design flaws as well as personnel training, maintenance and operation issues in the USS Grayback diver transfer system. It was concluded that a wet-side operator had opened the vent valve only partway, causing a vacuum to form.

Contributing factors included:

•Neither the vent valve, nor its operating linkage, had been lubricated properly

•Those who claimed to have done greasing maintenance didn’t know a fitting existed for greasing the vent valve

•Other grease fittings in the hangar were painted over or rusted shut

•17 gauges were overdue for calibration and another one was missing

•Hangar drain procedures had not been submitted to NAVSEA for approval; mandated changes to other procedures had not been made.

•Two senior watches were often combined, in violation of procedures

•Diver personnel had received less than 1-1/2 hours of diving training in the previous six months

•Not all participating divers had attended the pre-dive brief

Each one of these factors wasn’t catastrophic by itself, but when combined led to a tragedy.

Tragic events in January 1982 resulted in the creation of the Deep Submergence Systems (DSS) Certification Program (commonly referred to as DSS-SOC). The Navy now requires that all diving systems be designed to prevent or minimize the possibility of unintentionally causing a vacuum, and hazard and safety analyses are required during design. Additional work and material requirements are required during new construction and maintenance on DSS-SOC systems and components.

Thirty-eight years later, we as shipbuilders commemorate the anniversary of this tragedy by continuing to apply lessons learned and share the story of the men that lost their lives aboard the USS Grayback.

Today, the DSS certification process provides maximum reasonable assurance that a material or procedural failure that could imperil the operators or occupants will not occur, and that DSS personnel may be recovered without injury if there is an accident. The most current requirements are contained in the System Certification Procedures and Criteria Manual for Deep Submergence Systems, NAVSEA SS800-AG-MAN-010/P-9290 available on the DSS-SOC Program website.

As members of the EB Team, our challenge and responsibility is to maintain the high level of the standards established by the DSS Certification Program during design, new construction and maintenance work. Compliance with procedures is critical. Attention to detail, regardless of the task, should be the mindset we have with anything we do associated with diver safety. A questioning attitude is critical—am I using the correct lubricant? Did I maintain cleanliness of the breathing systems? Is my work task in the DSS-SOC boundary? Did I only use DSS-approved materials? Would I trust my life to this work?

Charles Wayne Bloomer and Rodney Lee Fitz (right).
William C. Robinson and Leslie C. Shelton (right).
Richard D. Bond

On the Waterfront, the Future Arizona is Coming to Life

An intricate, high-stakes choreography in Electric Boat’s North Yard is bringing the future Arizona (SSGN 803) to life as shipbuilders, led by Ship’s Manager Josh Leaf, continue to meet major milestones assembling the first submarine that features the Virginia Payload Module (VPM). In just a matter of weeks, EB teams in Groton and Quonset Point...Continue reading→

2026 Veterans Day Observances

Join us on Tuesday, November 10, 2026, for Electric Boat’s annual Veterans Day observances, as we gather together to honor our service members past and present. There will be ceremonies held for first-, second- and third-shift employees in Groton and Quonset Point. 2026 Veterans Day commemorative pins will be available for those in attendance. If...Continue reading→

Introducing the Native Americans & Indigenous People of Electric Boat (NAIP) Employee Resource Group

Electric Boat (EB) Employee Resource Groups (ERGs) play a vital role in supporting our diverse workforce while contributing to the success of our business. Formed to raise awareness and celebrate different cultures, communities, and experiences, these employee‑led groups foster a stronger sense of unity and belonging. ERGs cultivate an inclusive environment where employees can connect,...Continue reading→

EB Supports 45th Annual MLK Scholarship Awards

Electric Boat was proud to serve as a scholarship sponsor for the Dr. Martin Luther King, Jr. Scholarship Trust Fund at its 45th Annual Scholarship Awards Dinner. More than 600 community members gathered to celebrate this year’s extraordinary cohort of 2026 MLK Scholars. These 13 outstanding students were recognized for their academic excellence, leadership, character,...Continue reading→

Building the Future: EB’s New Central Distribution Hub

In April, Electric Boat (EB) began construction on the new central distribution hub for its warehousing, shipping, and receiving operations at 45 Frontage Road in North Stonington, CT. Since then, the 480,000‑square‑foot next‑generation warehouse facility has quickly taken shape. All wall panels are now complete, and construction is ahead of schedule. The facility will celebrate...Continue reading→

Groundbreaking Ceremony Marks Start of USS Groton Sail Monument

Fifty years after the USS Groton (SSN‑694) first launched, dozens gathered outside the Groton Public Library Oct. 9 to celebrate the groundbreaking of the USS Groton Sail Monument. The $6.6 million project—three decades in the making—will honor the men and women who design, build, operate and maintain the Navy’s submarines, as well as the families...Continue reading→

A Celebration of Heart, Community and Victory

2026 American Heart Association Eastern Connecticut Heart Walk Recap Saturday, October 3, 2026 | UConn Avery Point The 2026 American Heart Association Eastern Connecticut Heart Walk at UConn Avery Point was nothing short of extraordinary. Under bright autumn skies, 26 incredible Electric Boat teams and 151 walkers came together with passion, purpose, and unstoppable energy...Continue reading→